Saturday, December 18, 2004

Framing Complete

By December 3rd, the framing was complete.
You can see through the main archway into the media room and through to the archway that opens the library.

Here we can see the framing for the fireplace. This ended up not being the final location for the fireplace. After the framing was in, Jonathan realized that the joists above were not wide enough to pass the 10" flue that the GEM-36 model fireplace required. A quick scramble led us to move the fireplace into the media room, a solution that I actually like better anyway.

Here we're looking into the guest bedroom.

No comments: